Read the docs

Vulnerabilities

Filters

Reset all
Threatist priority
Signals
Fix status
Impact type
Attack vector
Requirements
Product

Products as named in CPE, with their records.

Published
Weakness (CWE)
2 selected

63 records

Priority HIGH 76

Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data so…

CVSS 3.1MEDIUM 6.6 Network High privileges No interaction EPSS 0.97906 Published 2021-12-28 Partial fix · 2.17.1, 2.3.2 +5 CWE-20
TI-2020-04467 CVE-2020-5421 · GHSA-rv39-3qh7-9v7w

RFD Protection Bypass via jsessionid

Priority MEDIUM 42

In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser…

CVSS 3.1MEDIUM 6.5 Network Low privileges User interaction EPSS 0.11564 Published 2020-09-19 Partial fix · 4.3.29, 5.0.19 +2 CWE-35
TI-2019-07539 CVE-2019-10219 · GHSA-m8p2-495h-ccmh

Cross-site scripting in hibernate-validator

Priority LOW 31

A vulnerability was found in Hibernate-Validator.

CVSS 3.1MEDIUM 6.1 Network No auth User interaction EPSS 0.02157 Published 2019-11-08 Partial fix · 6.0.18.Final, 6.1.0.Final +1 CWE-79
Priority LOW 32

faces/context/PartialViewContextImpl.java in Eclipse Mojarra, as used in Mojarra for Eclipse EE4J before 2.3.10 and Mojarra JavaServer Faces before 2.2.20, allows Reflected XSS because a client window field is mishandled…

CVSS 3.1MEDIUM 6.1 Network No auth User interaction EPSS 0.02469 Published 2019-10-02 Fixed in 2.2.20, 2.3.10 CWE-79
Load more